Today: 25.Oct.2020
USA
(Sidney A. Bernsen) USofA - Recommended actions to get nuclear power back on track
16.Jun.2017
Rate this item
(0 votes)

Sidney Bernsen - Nuclear Engineer, Former Chief Nuclear Engineer for Bechtel Power Corporation Nuclear Power Plants are currently too costly in the US to justify their construction as replacement for those that are being shut down, let alone to increase their contribution to clean energy. In fact we are likely to see a very significant reduction in their contribution electric energy production unless we can reduce their construction and operating costs. Many of these high costs are regulatory driven. It does appear that this effort will require the establishment of an Industry/NRC team of personnel dedicated to help make possible a realistic future for Nuclear power. The industry team should include NSSS suppliers, interested utilities and interested engineering and construction companies.

Read 1047 times Last modified on Saturday, 14 March 2020 22:14
  • Latest
  • Popular
  • John Shanahan, civil engineer, editor allaboutenergy.net: Many…
  • Sebastian Luening, paleogeologist, editor of kaltesonne.de: FFF,…
  • visualcapitalist.com: Following the 2011 Fukushima nuclear disaster…
  • .
  • Mr. Chairman, Senator Alexander, and members of…