Today: 19.Oct.2020
USA
(Washington Post, Steven Mufson) USofA - SC utilities halt work on 2 NPs dimmiing prospects for nuclear
31.Jul.2017
Rate this item
(0 votes)

Steven Mufson, Washington Post: The long quest to revive America’s nuclear power industry suffered a crippling setback when two South Carolina utilities halted construction on a pair of reactors that were once expected to showcase a modern design for a new age of nuclear power built at the V.C. Summer Nuclear Station. The project has been plagued by billions of dollars of cost overuns, stagnant demand for electricity, competition from cheap natural gas plants ... ..., and the bankruptcy of Westinghouse Electric, the lead contractor and the designer of the AP1000 reactor that was supposed to be the foundation of a smarter, cheaper generation of nuclear power plants.

Read 2265 times Last modified on Saturday, 14 March 2020 22:01
  • Latest
  • Popular
  • John Shanahan, civil engineer, editor allaboutenergy.net: Many…
  • Sebastian Luening, paleogeologist, editor of kaltesonne.de: FFF,…
  • visualcapitalist.com: Following the 2011 Fukushima nuclear disaster…
  • .
  • Mr. Chairman, Senator Alexander, and members of…